1 Scope of application
2 Normative references
3 Terms, symbols, units and abbreviations
3.1 Plant
3.2 Raw biogas
3.3 Biogas H, biogas L
3.4 Biogas production plant (BPP)
3.5 Biogas upgrading plant (BUP)
3.6 Biogas injection plant (BIP)
3.7 Refeeding plant
3.8 Process measuring and control technology
<
3.8.1 Monitoring and control devices
3.8.2 Safety Instrumented System (SIS)
3.8.3 Limiters
3.9 Mechanical safety devices
3.10 Compressor
3.11 Expert
3.12 Technical experts
3.13 Competent persons qualified to conduct tests to verify protection against electrical hazards
3.14 Competent persons qualified to conduct tests on explosion protection
4 General requirements
4.1 Coordination requirements and definition of interfaces
4.2 Requirements on the composition of upgraded biogas
4.3 Qualification requirements for plant design and manufacturing
4.4 On-site plant overview
4.5 Explosion protection 4.6 Hydrogen sulphide
4.7 Substances hazardous to water
5 Plant boundaries
5.1 Connections
5.2 Ancillary facilities
6 Biogas upgrading methods
7 Functional requirements
7.1 General functional requirements
7.2 Backflow and refeeding
7.2.1 General requirements
7.2.2 Unintentional backflow from a biogas upgrading plant
7.2.3 Unintentional backflow from a biogas injection plant
7.2.4 Process-related controlled refeeding 7.3 Functional requirements on biogas upgrading plants (BUP)
7.4 Functional requirements on biogas injection plants (BIP)
7.5 Functional requirements on plants for refeeding gas into upstream gas supply networks
8 Protection against inadmissible operating modes
8.1 Joint requirements
8.1.1 General
8.1.2 SIS and mechanical safety devices
8.1.3 Plant emergency shut-off
8.1.4 Protection against inadmissible overpressure
8.1.5 Protection against inadmissible underpressure
8.1.6 Protection against inadmissible gas temperatures8.1.7 Monitoring of ambient atmosphere 8.2 Special requirements on biogas upgrading plants
8.2.1 Protection against inadmissible underpressure and against the intrusion of outside air
8.3 Special requirements on biogas injection plants
8.3.1 Protection against the injection of gas of inadmissible composition
9 Requirements on plants, components and assemblies
9.1 General 9.2 Joint system requirements
9.2.1 Compressor stations
9.2.1.1 General requirements
9.2.1.2 Process control requirements
9.2.1.3 Sealing system
9.2.1.4 Electrical machines
9.2.1.5 Gas cooling systems
9.2.2 Mechanical safety devices for protection against inadmissible over and underpressure
9.2.3 Shut-off valves
9.2.4 Pipework
9.2.4.1 General requirements
9.2.4.2 Exhaust and depressurising lines
9.2.5 Non-storage pressure vessels
9.2.5.1 Filters, gas dryers and liquid separators
9.2.5.2 Expansion reservoirs
9.2.6 Function test equipment
9.3 Biogas upgrading plants
9.3.1 Pipework
9.3.1.1 Plastic pipework
9.3.1.2 Exhaust pipes
9.4 Biogas injection plants
9.4.1 Pressure regulating stations
9.4.2 Gas composition analysis
9.4.3 Gas measuring stations
9.4.4 Conditioning systems
9.4.5 Odorisation
9.5 Refeeding plants
9.5.1 Deodorisation
10 Construction and equipment
10.1 Structural requirements
10.1.1 Housing
10.1.2 Transport and escape routes
10.1.3 Installation in residential or commercially used buildings
10.1.4 Noise control
10.1.5 Apertures into the installation space
10.1.6 Walls, ceilings, roofs and ducts
10.1.7 Isolation of gas flow outside of the place of installation
10.1.8 Ventilation of the place of installation
10.1.9 Outdoor plant design
10.1.10 Working areas
10.1.11 Protection against harmful external influences
10.1.12 Safety marking
10.1.13 Corrosion protection
10.1.14 Installation of odorisation systems10.2 Electro-technical requirements10.2.1 Electrical equipment 10.2.2 Electrical resistance of floor coverings
10.2.3 Lighting equipment
10.2.4 Cable ducts
10.2.5 Insulating joints
10.2.6 Lightning protection and equipotential bonding
10.2.6.1 Protective equipotential bonding
10.2.6.2 External and internal lightning protection, lightning protective equipotential bonding
11 Testing
11.1 Tests carried out by the manufacturer
11.2 Tests at the place of installation
11.2.1 Compliance with safety-related approval and structural requirements
11.2.2 Connections to the plant
11.2.3 Tightness
11.2.4 Function
11.2.5 Explosion protection
11.2.6 Deviations from this Technical Rule 11.3 Testing of electrical systems and equipment
11.4 Tests for design pressures above 16bar
11.5 Proof of testing
11.5.1 Testing by the manufacturer
11.5.2 Testing at the place of installation
11.5.4 Testing of electrical systems and equipment
11.5.5 Documentation
12 Commissioning
Annex A (informative) ? Potential coordination requirements between plant operators
Annex B (informative) ? Hazardous area zone classification in biogas upgrading and injection plants
Annex C (informative) ? Compressor unit specification data sheet
Annex D (normative) ? Test schedule Annex E (normative) ? Test ratings in accordance with Clause 11
Bibliography