W 115 Technical Rule - Standard 07/2008 -PDF file-

Drillings for Exploration, Monitoring and Abstraction of Groundwater

79,28 €*
  • DVGW
  • 32 pages
  • available as PDF only
  • 3rd edition 2008
  • 1
  • 1
  • 510396
ST

79,28 €*

This Code of Practice W 115 provides information on the usual drilling methods and their applications. In addition, it contains references to possible faults during water development work, which may have consequences for operation, maintenance (regeneration, rehabilitation) and dismantling. As a summarising abstract it shall serve anyone involved with drilling operations as starting point for project-related considerations.
Preamble

1 Scope

2 Normative references

3 Definitions

3.1 Direct sampling

3.2 Indirect sampling

4 Water management requirements

5 Drilling methods

5.1 General principles

5.2 Classification of drilling methods

5.2.1 Basic procedural differences

5.2.2 Dry drilling

5.2.3 Flush drilling operations

5.2.3.1 Flush drilling methods

5.2.3.2 Direct circulation drilling methods

5.2.3.3 Reverse circulation drilling methods

5.3 Deviation from the borehole axis

5.3.1 Principles

5.3.2 Influence of the substratum

5.3.3 Influence of the drilling tools

5.3.4 Influence of the drilling method

5.3.5 Deviation measurements

6 Sample recovery and sample taking

6.1 General

6.2 Geological tasks

6.3 Hydrogeological tasks

6.4 Constructional tasks

6.5 Requirements on sample quality

6.6 Sample recovery

6.6.1 General

6.6.2 Influences on sample quality

6.6.3 Direct sampling

6.6.4 Indirect sampling

6.6.4.1 General

6.6.4.2 Methods with direct fluid circulation

6.6.4.3 Methods with reverse fluid circulation

6.7 Sample taking

6.7.1 General

6.7.2 Influences of sample taking on sample quality

6.7.3 Sample taking with direct sample recovery

6.7.4 Sample taking with indirect sample recovery

6.8 Sample quantity

6.9 Protection of sample material

6.10 Sample containers and their identification

7 Notification requirements and licenses under water law

8 Considerations regarding the contract specifications

9 Contract award

10 Inspections, acceptance of drilling operations

11 Documentation