Preamble
Introduction
1 Scope
2 Normative references
3 Terms and definitions
3.1 Well test
3.2 Aquifer test
4 Pumping tests
4.1 General
4.2 Pumping test types
4.2.1 Well tests
4.2.2 Aquifer tests
4.3 Pumping test objectives
4.4 Work flow
4.4.1 Pumping test - planning
4.4.2 Pumping test - execution
4.4.3 Pumping test - analysis
4.5 Pre-collection of data
4.6 Preparation
4.7 Test schedule
5 Pumping test types
5.1 General
5.2 Well tests
5.3 Aquifer tests
5.4 Test requirements
5.4.1 Measuring intervals and test duration
5.4.2 Array of monitoring points
5.4.3 Measuring accuracy
5.4.4 Concomitant measurements
5.5 Freedom from sand
6 Pumping test analysis
6.1 General
6.2 Identifying a suitable hydraulic model
6.3 Well test analysis
6.4 Aquifer test analysis
6.4.1 General
6.4.2 Line-of-best-fit method
6.4.3 Typical-curve method
6.4.4 Computer-based methods
6.4.5 Numerical methods
7 Water law
7.1 General
7.2 Permission
7.3 Proceedings for the preservation of evidenceAnnex A (informative) - Bill of quantities;aspects to be considered for pumping tests
Annex B (informative) - Check list
Annex C (informative) - Pumping test report:withdrawal well
Annex D (informative) - Pumping test report:measured values, withdrawal well
Annex E (informative) - Pumping test report:measured values, monitoring point
Annex F (informative) - Semi-logarithmicrepresentation
Annex G (informative) - Overview of selected terms