Zum Hauptinhalt springen Zur Suche springen Zur Hauptnavigation springen

W 124 Technical Rule - Standard 11/1998 -PDF file-

Inspections and acceptances during the construction of vertical filter wells

78,10 €

Mitgliederpreis: 58,57 €

Hrsg./Verlag
DVGW
Material
available as PDF only
Format
10 pages
Ausgabe
1st edition 1998
Hinweis
German version W 124
Artikel-Nr.
510404
Verkaufseinheit
1
Mindestabnahme
1

Sicherheitshinweis entsprechend Art. 9 Abs. 7 S. 2 der GPSR entbehrlich

Produkt Anzahl: Gib den gewünschten Wert ein oder benutze die Schaltflächen um die Anzahl zu erhöhen oder zu reduzieren.
ST
Artikel-Nr. 510404


Co2-neutral gedruckte DVGW-Arbeitsblätter


klimaneutraler Paketversand mit GLS und DHL


Zahlung auf Rechnung


1-3 Tage

The technical bulletin on hand makes recommendations for these inspections and acceptances of the awarded drilling and well construction work, which have been compiled on the basis of the set of technical rules and which shall be applied on a case‑by‑case basis.

It has become apparent that in order to avoid misunderstandings and costly rework, any acceptances and inspections shall have to be agreed beforehand between the parties involved within the scope of the bill of quantities/construction contract, in particular if the specialist company has to make available equipment and facilities at certain dates or work steps.

The selection of the acceptances and inspections to be performed in the individual case shall be guided by the hydrogeological conditions and shall be in line with purpose, type and scope of the structure and the materials used.

Sicherheitshinweis entsprechend Art. 9 Abs. 7 S. 2 der GPSR entbehrlich

Ausgabe: PDF-Download
The technical bulletin on hand makes recommendations for these inspections and acceptances of the awarded drilling and well construction work, which have been compiled on the basis of the set of technical rules and which shall be applied on a case‑by‑case basis.

It has become apparent that in order to avoid misunderstandings and costly rework, any acceptances and inspections shall have to be agreed beforehand between the parties involved within the scope of the bill of quantities/construction contract, in particular if the specialist company has to make available equipment and facilities at certain dates or work steps.

The selection of the acceptances and inspections to be performed in the individual case shall be guided by the hydrogeological conditions and shall be in line with purpose, type and scope of the structure and the materials used.