GW 315 Technical Rule - Standard 01/2020 -PDF-file-

Protection of Supply Systems during Construction Works

39,92 €*
  • DVGW
  • 14 pages 
  • available as PDF only
  • 2nd edition 2020
  • 1
  • 1
  • 512139
ST

39,92 €*

Code of Practice GW 315 provides essential information on how to avoid damaging to existing supply systems during construction operations. It applies to all construction work  and regulates the requirements for construction contractors and operators of supply systems.

Preface

1 Scope of Application

2 Normative References

3 Terms, Symbols, Units and Abbreviations

3.1 Operator (Operator of Supply Systems)

3.2 Supply Systems

3.3 Construction Contractor

3.4 Construction Works / Construction Activities

4 General Duties During Construction Works

5 Duty of Investigation

6 Location of Supply Systems

7 Start of Construction Work

8 Professional Supervision

9 Machine Operations

10 Excavation of Supply Systems

11 Measures in Case of Damaging

12 Documentation

Annex A (informative) – Measures in Case of Pipeline Content Leakage

Annex B (informative) – Quick Reference for Construction Designers and Construction

Contractors for the Protection of Supply Systems